CASISD OpenIR

浏览/检索结果: 共7条,第1-7条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Productivity assessment of the real estate industry in China: a DEA-Malmquist index 期刊论文
Engineering, Construction and Architectural Management, 2021, 期号: 0, 页码: 1-28
作者:  Liu Xiaoxiao;  Liu Huihui;  Yang Guoliang;  Pan Jiaofeng
Adobe PDF(1138Kb)  |  收藏  |  浏览/下载:180/0  |  提交时间:2022/03/01
Consumer Preferences for Electric Vehicle Charging Infrastructure Based on the Text Mining Method 期刊论文
ENERGIES, 2021, 卷号: 14, 期号: 15
作者:  Wang, Yuan-Yuan;  Chi, Yuan-Ying;  Xu, Jin-Hua;  Li, Jia-Lin
收藏  |  浏览/下载:149/0  |  提交时间:2022/02/10
Consumer preferences for electric vehicle charging infrastructure based on text mining method 期刊论文
Energies, 2021, 卷号: 14, 期号: 15, 页码: 4598
作者:  Chi YY(迟远英);  Wang YY(王媛媛);  Xu JH(许金华);  Jia-Lin Li
收藏  |  浏览/下载:191/0  |  提交时间:2022/03/01
charging infrastructure  natural language processing  public comment assessment  consumer preferences  regional differences  
历次科技规划核心理念、发展阶段和政策重点的演化分析——基于文本挖掘方法 期刊论文
科学管理研究, 2021, 卷号: 39, 期号: 02, 页码: 42-51
作者:  王婷;  蔺洁;  刘小玲
Adobe PDF(3062Kb)  |  收藏  |  浏览/下载:142/1  |  提交时间:2022/01/26
科技规划  核心理念  演化研究  文本挖掘  
Optimal selection of heterogeneous ensemble strategies of time series forecasting with multi-objective programming 期刊论文
Expert Systems with Applications, 2021, 卷号: 166, 页码: 114091
作者:  Jianping Li;  Jun Hao;  Qianqian Feng;  Xiaolei Sun;  Mingxi Liu
Adobe PDF(1654Kb)  |  收藏  |  浏览/下载:232/0  |  提交时间:2021/01/26
Multi-objective optimization  Ensemble forecasting  Machine learning  Evolutionary algorithm  Baltic Dry Index  
Probabilistic risk assessment for interdependent critical infrastructures: A scenario-driven dynamic stochastic model 期刊论文
Reliability Engineering & System Safety, 2021, 卷号: 214, 期号: 0, 页码: 107730
作者:  Weilan Suo;  Lin Wang;  Jianping Li
Adobe PDF(1683Kb)  |  收藏  |  浏览/下载:197/0  |  提交时间:2022/03/01
Aggregating risk matrices under a normative framework 期刊论文
Journal of Risk Research, 2021, 卷号: 24, 期号: 8, 页码: 999-1015
作者:  Wu DS(吴登生)
Adobe PDF(2619Kb)  |  收藏  |  浏览/下载:270/1  |  提交时间:2022/03/09
risk matrix